Close Menu
Complete Lagos
  • News
  • Politics
  • Business
    • Brands
  • Entertainment
  • Education
  • Sports
  • Historical Lagos
  • Interview
  • Royal Lagos
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Complete LagosComplete Lagos
Subscribe
  • News
  • Politics
  • Business
    • Brands
  • Entertainment
  • Education
  • Sports
  • Historical Lagos
  • Interview
  • Royal Lagos
Complete Lagos
Home»News»FG closes Ijora bridge for critical repair works April 27
News

FG closes Ijora bridge for critical repair works April 27

Complete LagosBy Complete LagosApril 21, 2025No Comments3 Mins Read12 Views
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

The Federal Government has announced full closure of the Ijora Bridge in Lagos, starting from April 27, for critical repair works.

The Federal Controller of Works, Lagos, Mrs Olukorede Kesha, made this known during an inspection of the bridge on Monday.

She said that the bridge connecting Ijora Causeway to Apapa needed comprehensive repairs, especially replacement of defective bearings beneath the deck.

Kesha said: “This bridge has been awarded for some time now in different phases.

“We are now at the final phase, which involves lifting the entire bridge deck to change the faulty bearings beneath.

“A lot of the bearings are defective, and approximately 50 of them will be replaced across three sections.”

Kesha emphasised the importance of the Ijora Bridge as a major route leading to Apapa, home to two of Nigeria’s busiest ports, Tincan and Apapa ports.

She acknowledged the disruption the closure would cause but said that it was necessary for the safety of commuters and to prevent further deterioration.

She said that, to manage expected gridlock, motorists approaching from Ijora would be redirected through the Seven Up Roundabout to reconnect to Apapa.

She said that heavy-duty vehicles would be diverted via Costain through Iganmu to access Apapa.

Kesha reassured the public that the Federal Ministry of Works had carefully planned the diversion routes and did not anticipate major issues.

She appealed to road users for understanding and cooperation.

She also said that the repairs would be time-sensitive.

According to her, the ministry has received complaints from concerned citizens who have noticed intense vibrations on the bridge.

Kesha gave the assurance that the bridge would not collapse, but admitted the bridge needed urgent attention.

She said, “It won’t collapse, but it definitely needs help. If you drive on the bridge now, you will feel vibrations.

“That is because the bearings, the spring-like supports under the deck, have weakened significantly.”

“These repairs, she added, would be the first major work on the Ijora Bridge since it was constructed decades ago.

She said the initial phase of the work, which would involve lifting the deck and replacing the bearings, would require full closure.

However, subsequent activities such as removing and replacing the asphalt might be done in stages, possibly on Sundays, to reduce traffic disruption, according to the official.

Kesha emphasised the importance of public awareness, noting that the Minister of Works, Sen. Dave Umahi, had mandated that any bridge closure must be widely publicised.

“We want members of the public to know that this is for their safety.

“With their cooperation, we can finish this work in time and restore the bridge to a much safer condition,” she said.

Federal Controller of Works Lagos Mrs Olukorede Kesha
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAmukoko: Over ₦10m raised in 4 days to relocate boy who faced Peter Obi’s convoy — Lawyer
Next Article Ikoyi: Bode George calls for ‘immediate’ expulsion of Atiku, Wike from PDP over anti-party activities
Complete Lagos
  • Website

Related Posts

Lagos hotel room rates hit N205,534 as supply lags

January 3, 2026

LASG strengthens framework for debt management

January 1, 2026

Fatal crash: Anthony Joshua discharged from hospital

January 1, 2026

Comments are closed.

Recent Posts

  • Tunde Onakoya urges inclusive chess for children with disabilities
  • Lagos hotel room rates hit N205,534 as supply lags
  • LASG strengthens framework for debt management
  • Fatal crash: Anthony Joshua discharged from hospital
  • Six die, others missing in Lagos boat mishap

Recent Comments

No comments to show.
About Us
About Us

We are a Lagos based and Lagos focused online newspaper devoted to reporting the city-state of Lagos. Everything about Lagos is our concern. From the oval office to street hustling and bustling without sparing the road, air and see. We are committed to celebrating Lagos splendour without shying away from it's squalour.

© 2026 Complete Lagos. Designed by DeedsTech.
  • About Us
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.