Close Menu
Complete Lagos
  • News
  • Politics
  • Business
    • Brands
  • Entertainment
  • Education
  • Sports
  • Historical Lagos
  • Interview
  • Royal Lagos
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Complete LagosComplete Lagos
Subscribe
  • News
  • Politics
  • Business
    • Brands
  • Entertainment
  • Education
  • Sports
  • Historical Lagos
  • Interview
  • Royal Lagos
Complete Lagos
Home»Business»FAAN To Cut Power Supply To Lagos International Airport For 4 Hours Today
Business

FAAN To Cut Power Supply To Lagos International Airport For 4 Hours Today

Complete LagosBy Complete LagosNovember 16, 2024No Comments1 Min Read24 Views
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

The Federal Airports Authority of Nigeria (FAAN) has announced that it would shut down power supply to the international terminal of the Murtala Muhammed Airport, Lagos for over four hours.

In a statement signed by the Director, Public Affairs and Consumer Protection, Mrs. Obiageli Orah, the agency said electricity supply would , be off at the terminal between  the hours  of 0100hrs and 0430hrs (four hours, 30 minutes) in the morning of Saturday (today), November 16, 2024 for the replacement  of the Bus Riser 11KVA high tension panel.

“The proposed electrical power supply maintenance  shutdown  will be carried  out with minimal  disruption  to flight operations  and passenger  facilitation. Royal Air Maroc ,which operates within  the maintenance  hour, will be relocated  for  check-in  and arrival  (parking) formalities  to  International Terminal 1( ITZ- 1); that is the olf terminal.

FAAN said it would notify airlines, security agencies and concessioners, adding that it regretted any inconvenience caused to stakeholders and passengers.

“The safety and security of all airport users will  always be paramount in our considerations,” it stated.

Federal airports authority of Nigertia Mrs Obiageli Orah Murtala Muhammed airport
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWema Bank Wins Multiple Awards
Next Article Femicide: Societal Concerns To Hold Symposium On Violence Against Women 
Complete Lagos
  • Website

Related Posts

Lagos hotel room rates hit N205,534 as supply lags

January 3, 2026

LASG strengthens framework for debt management

January 1, 2026

Fatal crash: Anthony Joshua discharged from hospital

January 1, 2026

Comments are closed.

Recent Posts

  • Tunde Onakoya urges inclusive chess for children with disabilities
  • Lagos hotel room rates hit N205,534 as supply lags
  • LASG strengthens framework for debt management
  • Fatal crash: Anthony Joshua discharged from hospital
  • Six die, others missing in Lagos boat mishap

Recent Comments

No comments to show.
About Us
About Us

We are a Lagos based and Lagos focused online newspaper devoted to reporting the city-state of Lagos. Everything about Lagos is our concern. From the oval office to street hustling and bustling without sparing the road, air and see. We are committed to celebrating Lagos splendour without shying away from it's squalour.

© 2026 Complete Lagos. Designed by DeedsTech.
  • About Us
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.